Special attention to tighten the process of quartz glass
on both sides of the gasket displacement, such as the gasket did not put the flat, quartz glass should be removed, repeat the above process. Open the laser power switch, termination junction box to
launch AC1 and AC2 terminals for 220V, 50Hz power. Users will completely free from staying at the side of the computers by using green laser pointer with remote control.
Placed on a graph paper at the receiving end of the quartz glass surface, and check the spot whether at its center. If not, loosen the fastening screw on the transmitter housing (screw on the
adjustment method: release the transmitter front-end, four fastening screws, turn the adjustment screw, adjust the spot horizontal and vertical positions. ) and fastening screws. At this point, the
initial installation and commissioning of complete, turn off the laser power switch, turn off both sides of the Dg100 Pg25 stainless steel valve. Warning: The above operation is limited to the cold
state (ie, no high-temperature flue gas) in the flue pipe circuit system installation. In order to ensure the monitoring points accurate signal transmission to the meter cabinet, dual-core shielded
cable transmission signal from the monitoring point to the instrument cabinet. The power of torch-like green laser pointer is of the IV grade.
Chopped light and the laser power to receive the circuit board. 400Hz cut-ray device is installed between the laser tube joints. The laser power receivers installed on clarinet components. Cut the
light Blades door center and the beam center overlap, the output signal can be detected, the test point is to cut the light leads to the signal line. Ground in the circuit board to terminals. The
laser power detector is located in the same board for part of the measuring beam splitter reflected light. The transmitter driver in the launch explosion-proof box, fixed in the center of the
explosion-proof box, Light Chopper output measured in B8B9 this result with the aforementioned measurement results, the laser power signal can be measured in B6B7. Prevent laser ray of torch-like
green laser pointer from irradiating to your skins.
Four-quadrant detector to receive the drive, four-quadrant detector is located in the lens group. Drive as the transmitter central receiving the explosion-proof box + X,-X, + Y,-Y in the A8, the
A7, A6, A5, measured, the X1 X2 Y1 Y2 in the B8B9, B6B7, B4B5, B2B3 measured. Signal the size of the received optical signal size and is related to the center. In the case of a good center, the sum
of the X--X-, Y-,-Y signal. Signal processor electronics unit.
没有评论:
发表评论